Emissions, releases, and waste management
Air emissions
The Group’s manufacturing operations
measure and monitor air emissions in
accordance with permit requirements. For
example, Oconbrick undertakes a monthly
monitoring and measurement of air quality
and Much Asphalt monitors particulate
matter and gaseous emissions at all of its
sites. Much Asphalt Polokwane, Nomad and
Witbank plants were regrettably not compliant
with dust emissions, with 6,6 tonnes of
particulate matter being released at the
Polokwane plant, the only plant without
a filtration system. Capital expenditure has
been allocated to remedy the situation in
Polokwane and the Nomad and Witbank
plants have been repaired and the situation
remedied. Gaseous emissions (CO, CO2,
SO2, NO2) are a bi-product of Much Asphalt’s
fuel combustion from burners and all tests
conducted in this regard have been within
legal limits.
No testing is undertaken by our mining
operations as it is carried out by clients.
Asphalt plants at the sites of Concor Roads
& Earthworks are tested extensively and all
tests have passed. Murray & Roberts
Construction and Gautrain only monitor
dust on sites.
Surface and ground water releases
The Group recorded several minor hydrocarbon
spillages of less than 25 litres, with
the Gautrain project reporting approximately
80 oil spill incidents. In addition, there were
two significant hydrocarbon spillages on the
Gautrain project of 300 and 500 litres of
hydraulic oils and fuel, which have been
remedied.
 |
Murray & Roberts engages its operations which contribute most to the overall group carbon footprint to determine emission reduction actions |
The formal directive issued to Bombela by
the South African Department of Water
Affairs and Forestry (DWAF) on 12 December
2008 remains in place over the Gautrain
project. However, some aspects have been
closed. Bombela has been allowed to pump
water to storm at one of four permanent
discharge points, namely Sandspruit and
rehabilitation of Mushroom Farm Park is
complete. A number of items are still
outstanding and Bombela expects to be
granted approval after construction is
complete for the other three permanent
discharge points. Final water crossing
works are in process and Bombela expects
to gain clearance on this issue by end
September 2010. The remedial actions
have to date been implemented to the
Group’s satisfaction and we will continue to
monitor the situation.
Murray & Roberts Cementation reported
two contraventions during the year, where
the construction of a “French drain” system
at Pandora 3 Shaft was not compliant with
the client’s environmental management
plans and at PK 2 Shaft where disposal of
hazardous waste was done without having
the required safe disposal certificates. Both
incidents have been remedied.
Waste generation and disposal
Waste generated by Murray & Roberts
includes scrap steel, paper and plastic,
waste bricks, concrete and hydrocarbons (oil and fuel). Waste generated is measured and monitored at an operational level,
however the data is currently inconsistent and incomplete so no aggregation of data is
possible at this time. Non-hazardous waste (concrete, brick, paper, steel) is either recycled or
reused. Hazardous hydrocarbons and plastic waste is removed and recycled where possible.
|